CASE STUDY

South Parade, Phase 2

BUDGET
CLIENT
DATE
DURATION
PROJECT SCOPE
Main works – Carriageway
Plane to a depth of 100mm over 1250m2 and replace binder course
Plane 40mm over 5113m2 and replace surface course with SMA10 H/S
Replace 14no ironworks
 
Main Works – Footway
Overlay 134m2 footpath with black AC6
Overlay 159m2 with AC6 Red surface course
 
Side Street 
Lift & Reset 11l/m kerbline
Plane 70mm over 321m2
Relay with SMA14 H/S
 
Hall Cross Hill
Regulate with 95t AC20 binder course
Plane 40mm over 1092m2
Lay 40mm SMA10 H/S surface course over 1092m2
“Lorem Ipsum is simply dummy text of the printing and typesetting industry. Lorem Ipsum has been the industry's standard dummy text ever since the 1500s...”

Steven Smith - Doncaster City Council - Doncaster, UK

similar case studies

CASE STUDY

River Dearne Bridge, Harlington

HARLINGTON, YORKSHIRE
CASE STUDY

Paleus Chemicals, Denaby

DENABY, YORKSHIRE
CASE STUDY

South Parade, Phase 2

DONCASTER, YORKSHIRE
CASE STUDY

Surfacing

DONCASTER, YORKSHIRE
CASE STUDY

Mexborough Bridge

MEXBOROUGH, YORKSHIRE

start your project

Looking to get started on your next civil engineering project?
We’re here to help you with an end-to-end solution.

Looking to get started on your next civil engineering project?We’re here to help you with an end-to-end solution.